Calculate Your Project
Costs Instantly
Generate Quotation
Key Features of the Cost Calculator

Area Input
Enter the total area of your project to get started.Choose Your Carcass Material
Select from premium materials like Century HDHMR, Action Tesa, or MDF with detailed pricing per square foot for better clarity.Select Carcass Tape Thickness
Pick from a range of tape thickness options, ensuring durability and aesthetics.Shutter Finish Options
Choose from Mart/Glossy Finish, PU Acrylic, or premium Merino/Century sheets – all customizable to fit your style and budget.Fittings Selection
Opt for trusted brands like Hettich, Roots German, or Century fittings, designed for functionality and reliability.Shutter Board Choices
Personalize your shutters with materials like MDF, HDHMR, or Century Sainik Block Board to suit your preferences.Shutter Tape Options
Enhance the finish with shutter tapes in varying thicknesses for added strength and style.
Additional Notes:
- Hinges and Drawers: We include 1 drawer for every 15 sqft. Additional drawers can be added at ₹3500 per unit.
- Attachments: Handles, locks, belt holders, and other accessories are available at MRP for your convenience.
Construction Cost Estimator
Professional tool for estimating construction costs with automatic area calculation
Project Parameters
Auto-Fill Note:
Slab coverage is calculated as a percentage of plot area. Default is 85%.
Coverage area will automatically fill Ground, First, and Second floors.
Mumty area defaults to 250 sqft area.
Basement and Stilt floors also auto-fill with coverage area.
Brick Specifications
Base brick cost: ₹7.3 per piece
Any variation above this will be payable by the client
Floor Areas
Floor Type | Area (sqft) | Cost per sqft | Total Cost |
---|---|---|---|
Basement | ₹1500 | ₹0 | |
Stilt Floor | ₹1050 | ₹0 | |
Ground Floor (GF) | ₹1050 | ₹0 | |
First Floor (FF) | ₹1050 | ₹0 | |
Second Floor (SF) | ₹1050 | ₹0 | |
Third Floor | ₹1050 | ₹0 | |
Mumty | ₹1050 | ₹0 | |
Total | 0 sqft | ₹0 |
Door Frame Specifications
Note: Base GI frames are included. Sagwan frames cost extra.
Structural Options
Steel Structure Type
Concrete Grade
Construction Add-Ons
Cost: ₹20 per kg of steel used
Cost: ₹70 per sqft of basement area
Cost: ₹20,000
Cost: ₹10,000
Cost Estimation Results
Steel Required
Construction Cost
Total Cost
Detailed Cost Breakdown
Payment Terms
Amounts shown are estimates. Final cost may vary based on actual requirements and market conditions.
Project Specifications
Our construction projects include premium materials and expert execution to ensure quality and durability. Specifications will vary based on your selections.
Structural Materials
- Steel: Ambha Shakti or Rathi Steel Max
- Cement: ACC Premium Grade
- Concrete: M20 grade
- Blocks/Bricks: High-density concrete blocks/bricks with cement plaster and chicken mesh on concrete joints
Plumbing System
- Water Supply: Supreme SDR 11 pipes
- Drain Lines: Supreme 6kg pipes
- Water Tank: 500L capacity per 1500 sqft construction
- Fixtures: Standard ISI marked fixtures
Electrical System
- Wiring: Not provided in the package
- Conduiting: GI boxes and conduits provided
- Switches & Sockets: Not provided in the package
- Distribution Board: Provided without MCBs
Construction Process
- Excavation: Cost included in project
- Drawings: Client must provide approved drawings
- Government Fees: Payable by the client
- Quality: Expert supervision to prevent reworking
Quality Monitoring
Our team has extensive experience in metro, tunnel, and large infrastructure projects, ensuring structural expertise. We provide:
- Daily progress reports via our in-house application
- Advanced quality monitoring systems
- Industry-leading construction expertise
- Precision engineering for all structural elements
Important Notes
• Government fees and sanction charges are payable by the client
• No architectural cost included. Client must provide approved drawings
• Brick cost base is ₹7.3 per piece. Any variation above will be payable